Mantis Bugtracker          
testlink.org

View Revisions: Issue #6996 All Revisions ] Back to Issue ]
Summary 0006996: Copy Test Suite: can't keep Assigned Requirement
Revision 2015-03-11 21:33 by fman
Description During Test Specification, when I want to move a test suite in another test suite, the requirement assignment of the tests contained in the moved test suite are kept.
But if I copy a test suite in another test suite, the requirement assignment is lost.
Revision 2015-03-11 08:55 by tinette
Description
During Test Specification, when I want to move a test suite in another test suite, the requirement assignement of the tests contained in the moved test suite are kept.
But if I copy a test suite in another test suite, the requirement assignement is lost.

Is it possible to have the same behavior than keyword assignement, ie a checkbox to allow or not the copy of requirement assignement ?



Copyright © 2000 - 2019 MantisBT Team
Powered by Mantis Bugtracker